Project financing banner
News

View Our Portfolio

Portfolio

Workshop Machining & Fabrication Work

All manufactured products are accompanied by Quality Controlled Data Packs to ensure traceability & quality of all work Data Packs compiled as per ISO3834 requirements mainly consisting of:• Holding points• Third party inspection report• PQR, WPS, WQR• Material...

News, Portfolio

Annual Major Maintenance Shut Down

Major Service on Sinter Cooler:• Replace cooler cars.• Replace inner rail.• Replace dip rail.• Replace drive wheels.• Replace guide wheels.• 3D scanning and alignment. Sizing Screens Service (3 off):• Replace screening media (tear drop plates and wire mesh).•...

CSS Engineering target and supply of the mining, engineering and construction, steel mills, food and beverage, transport
Portfolio

COMPLETED PROJECT – EARTH MOVING WORKSHOP

COMPLETED PROJECT – EARTH MOVING WORKSHOP CSS Engineering offers a One Stop Engineering Solution through the different Divisions that form an Integral Part of the CSS Group. Manufacture, Supply and Installation of a 1554m2 Earth Moving Workshop inclusive of:• All...

Portfolio

COMPLETED PROJECT – REFURBISH C3054 JAW CRUSHER

COMPLETED PROJECT – REFURBISH C3054 JAW CRUSHER CSS Engineering offers a One Stop Engineering Solution through the different Divisions that form an Integral Part of the CSS Group. • Disassemble Jaw crusher• Measure and record all Critical Dimensions• Pre-machine,...

Portfolio

COMPLETED PROJECT – HOLDING BINS

COMPLETED PROJECT – HOLDING BINS CSS Engineering offers a One Stop Engineering Solution through the different Divisions that form an Integral Part of the CSS Group. Design, Manufacture & Supply of 75m3 ROM Holding Bins (2 off)• Lined with 12mm VRN400 Liners on...

Portfolio

COMPLETED PROJECT – HIGH SIDED PAN FEEDERS

COMPLETED PROJECT – HIGH SIDED PAN FEEDERS CSS Engineering offers a One Stop Engineering Solution through the different Divisions that form an Integral Part of the CSS Group. Design, Manufacture and Supply of High Sided Pan Feeders (4 off) for the Mining Industry....

Portfolio

Completed Project – 16m3 Magnetite Mixing Tank

CSS Engineering offers a One Stop Engineering Solution through the different Divisions that form an Integral Part of the CSS Group. Design, Fabrication and Installation of Magnetite Mixing Tank for Coal Mine DMS (Dense Media Separation)• Tank Volume – 16m Cube• Hot...

Portfolio

Completed Project – Bucket Elevator

CSS Engineering manufactured, installated and Commissioned an 24m Bucket Elevator for the Mining Industry. Manufacture, Installation and Commissioning of 24m Bucket Elevator• Capacity – 62m3/h.• Speed – 1.34m/s.• Height – 24m.• Media and Size – Silica Sand minus...

Structural Banner
Contact

016 362 4152/3

info@cssengineering.co.za

www.cssengineering.co.za

34 SIEG KUSCHKE AVE
SYBRAND VAN NIEKERK PARK
MEYERTON, 1962

Designed by Bunnypants Graphic & Web Design Studio | 2022

Facebook    Linkedin    Google    Whatsapp

DESIGNED BY BUNNYPANTS GRAPHIC & WEB DESIGN STUDIO | 2022

LinkedIn
Messenger
Telegram
Phone
Email
WhatsApp
Messenger
WhatsApp
Phone
Email
Telegram
LinkedIn